86-0769-8266-3318
Home > Products > Precision Plastic Connector Mold Parts > precision mold parts >

Precision Complex Connector Cavity Mold Inserts Parts 2pcs in 1.2344 Steel

Precision Complex Connector Cavity Mold Inserts Parts 2pcs in 1.2344 Steel

Precision Complex Connector Cavity Mold Inserts Parts 2pcs in 1.2344 Steel
Precision Complex Connector Cavity Mold Inserts Parts 2pcs in 1.2344 SteelPrecision Complex Connector Cavity Mold Inserts Parts 2pcs in 1.2344 SteelPrecision Complex Connector Cavity Mold Inserts Parts 2pcs in 1.2344 Steel
Categoriesprecision mold parts
AlbumView larger image
ModelKR081
Place of Origin:Dongguan, China (Mainland)
Minimum Order Quantity:1 Pcs
Price:Negotiable
Packaging Details:Inner package with PE film first, then out package with Plastic box, carton last,Base on customer's requiry.
Delivery Time:Normally, simple parts, 5-7 days, complicated parts, 7-15 days. according to customer drawing, quantity and material,special case will be sooner
Payment Terms:T/T 50% as deposit 50% before shipment
Supply Ability:1200-1500 units per month
Size:According To Your Drawing
Update Time2018-12-17
Detail Information

Precision Complex Connector Cavity Mold Inserts Parts 2pcs in 1.2344 Steel

Introduction: Injection Mold Components

Item

Custom Injection Mold Cavity and Core Components for Automobile Connector Molds

Material

P20 is used for this mold part, or according to customer equirement.

Application

Applicate for automotive industry, electronic and electrical appliances, medical industry, concerning connector molding parts, auto parts, medical parts and other tooling, etc.

Customized

We accept customized product. You can provide us the product or 3D or 2D drawing.

Tolerance

± 0.005 mm

Software

CAD, Pro-E, UG, solid works, etc.

Equipments

Grinding Machines, EDM machines, WEDM, CNC Milling

Quality Control

Following the quality systems ISO9001, Kingrui takes quality controls step by step, from drawing audit, material checking, inspection at each process, to packing.

Delivery Time


It generally requires 5 to 15 days after getting down-payment bills for mold parts to be made, supposing the 3D files are accurate.

Payment term

50% deposit, 50% before shipment.



Our Capabilities

Processing Equipments

 Inspection Equipments


  • Japan Sodick supper- mirror and electro- discharge machine (4 sets)
  • Japan mitsubishi mirror EDM (4 sets)
  • Taiwan qunji EDM (4 sets)
  • Surface grinding machine (15)
  • High- speed cnc engraving and milling machine (4)
  • Certerless grinder (2 sets)
  • Internal- external lapping machine (4)
  • Milling (2 sets)
  • Wire- EDM (2 sets)
  • Projector for digital measuring instrument (3 sets)
  • Switzerland TRIMOS height gages (1set)
  • Japan Nikon height gages (5 sets)
  • Two dimension (4 sets)
  • Hardness meter (1set)
  • Micrometer (15 sets)
  • Micrometer (10 sets)






Special Explanation for Us

1. Full OEM service: materials, sizes, processing, packaging, transportation, etc.

2. More than 11 years experience in mold parts processing

3. Answer the offer within 12 hours

4. According to your request, fast delivery guarantee

5. Take seriously every customer, strictly adhere to each process
Please send your message to us
*We will reply your inquiry to this Email as soon as we see it
*Email
Name
Tel
*Title
*Content

Agree to use terms of service